LNG Carrier Membrane 180K Kangrim Boiler Spare Parts Kit - KBOK-1007226

Part Number
KBOK-1007226
Manufacturer
Samsung Heavy Industries
Vessel Type
LNG Carrier Membrane 180K
Category
Marine Boilers & Economizers
Condition
Overhauled
Certification
Lloyd's Register Certified
Price
Contact us for pricing
Availability
In Stock
Request a Quote for KBOK-1007226

About This Marine Part

The LNG Carrier Membrane 180K Kangrim Boiler Spare Parts Kit (Part Number: KBOK-1007226) is a marine boilers & economizers component that supports steam generation, heating, and waste heat recovery. This part is engineered for the LNG Carrier Membrane 180K vessel platform and is manufactured by Samsung Heavy Industries. It is available in multiple conditions including New, Overhauled, Serviceable, and As-Removed. All units come with Lloyd's Register Certified documentation and full traceability records to meet classification society and flag state requirements.

Frequently Asked Questions

Is KBOK-1007226 compatible with all LNG Carrier Membrane 180K configurations?
Yes, KBOK-1007226 (LNG Carrier Membrane 180K Kangrim Boiler Spare Parts Kit) is designed for the LNG Carrier Membrane 180K platform. However, specific vessel configurations, engine types, and classification society requirements can vary. Contact our team with your vessel's IMO number or specifications and we will confirm exact compatibility before quoting.
Is KBOK-1007226 available in new and overhauled condition?
We source LNG Carrier Membrane 180K Kangrim Boiler Spare Parts Kit in multiple conditions including New, Overhauled, Serviceable, and As-Removed. The current listing shows this part in Overhauled condition. If you require a different condition, submit an RFQ and our sourcing team will check availability across our global supplier network.
What certification documentation comes with KBOK-1007226?
This part is Lloyd's Register Certified. Depending on the condition and source, documentation may include original manufacturer certificates, classification society approval letters, overhaul shop release notes, and traceability records. All documentation is provided prior to shipment for your review and approval.
How quickly can KBOK-1007226 be sourced and delivered?
Lead times vary based on condition, availability, and your delivery location. Stock items typically ship within 1–3 business days. For overhauled or hard-to-find parts, sourcing may take 5–15 business days. We offer AOG (Aircraft/Vessel on Ground) expedited service for urgent requirements — contact us directly for priority handling.
Can KBOK-1007226 be shipped internationally?
Absolutely. Ship Parts Direct delivers to ports, shipyards, and facilities worldwide. We handle all export documentation, customs paperwork, and can arrange door-to-port or door-to-door delivery. Freight options include air freight for urgent orders and sea freight for cost-effective bulk shipments.

Related Parts for LNG Carrier Membrane 180K